DOĞRU MÜHENDİSLİK is an independent engineering firm with 29 years of experience in transportation, urban infrastructure, structures, energy, and water resources projects, delivering safe, economical, and sustainable engineering solutions through an interdisciplinary approach and a boutique service mindset.
The Aslancık Dam and Hydroelectric Power Plant (HPP) Project is located on the Harşit River in the Eastern Black Sea Region of Türkiye. The project area lies within the boundaries of Tirebolu District of Giresun Province.
The structures included in the project consist of the following components:
| Dam Body Volume | 22,400 m3 |
|---|---|
| Height from Foundation | 29 m |
| Dam Type | Concrete Gravity |
| Reservoir Volume | 1,600,000 m3 |
| Spillway Type | Frontal Intake |
| Number of Spillway Gates | 3 |
| Transmission Tunnel Type | Modified Horseshoe |
| Energy Tunnel Length | 13 km |
| Surge Tank Diameter | 23 m |
| Surge Tank Height | 50 m |
© 1986-2026 Doğru Engineering | All rights reserved.
Developed by: Idesa Creative