The Kavak Hydroelectric Power Plant (HPP) Project is located in the Eastern Black Sea Region in northern Türkiye, within the boundaries of Artvin Province, in the coastal district center of Arhavi.

Project Facilities

The structures included in the project consist of the following components:

  • Kavak Regulator
  • Water intake structure
  • Energy tunnel
  • Head pond
  • Penstock
  • Powerhouse building

Project Characteristics

Design Discharge 30 m3/s
Number of Units 3 units
Turbine Type Horizontal Francis
Regulator Type Gated
Number of Gates 5 units

Services Provided

  • Preparation of the Feasibility Report
  • Preparation of the Final Design Projects
  • Preparation of the Detailed Design (Implementation) Projects