Tuzköy HPP Final and Detailed Design Projects

Project Location

The Tuzköy Hydroelectric Power Plant (HPP) Project is located on the Kızılırmak River, within the boundaries of Gülşehir District of Nevşehir Province, downstream of the Yamula and Bayramhacılı Dams.

Project Facilities

The structures included in the project consist of the following components:

  • Tuzköy Regulator
  • Water intake structure
  • Transmission channel
  • Powerhouse building

Project Characteristics

Design Discharge 60 m3/s
Number of Units 2 units
Turbine Type Francis
Regulator Type Inflatable Weir

Services Provided

  • Preparation of the Feasibility Report
  • Preparation of the Final Design Projects
  • Preparation of the Detailed Design (Implementation) Projects