The Pınar Regulator and Hydroelectric Power Plant (HPP) Project is located in the Southeastern Anatolia Region, within the boundaries of Tut District of Adıyaman Province, on the Göksu River. The project area is situated to the south of the Tut District center, with the district located to the north between the regulator and the powerhouse.

Project Facilities

The structures included in the project consist of the following components:

  • Pınar Regulator
  • Water intake structure and settling basin
  • Transmission channel
  • Head pond
  • Penstock
  • Pınar HPP powerhouse building

Project Characteristics

Design Discharge 50.00 m3/s
Number of Units 3 units
Installed Capacity 30.10 MW
Gross Head 70.84 m
Total Energy 137.60 GWh/year
Regulator Height 7.00 m
Crest Length 75.00 m
Transmission Channel Type Trapezoidal Channel
Transmission Channel Length 12,120.00 m
Penstock Diameter 3.60 m
Penstock Length 105.00 m

Services Provided

  • Preparation of the Preliminary Study Report
  • Preparation of the Feasibility Report
  • Preparation of the Final Design Projects
  • Preparation of the Detailed Design (Implementation) Projects