DOĞRU MÜHENDİSLİK is an independent engineering firm with 29 years of experience in transportation, urban infrastructure, structures, energy, and water resources projects, delivering safe, economical, and sustainable engineering solutions through an interdisciplinary approach and a boutique service mindset.
The Pınar Regulator and Hydroelectric Power Plant (HPP) Project is located in the Southeastern Anatolia Region, within the boundaries of Tut District of Adıyaman Province, on the Göksu River. The project area is situated to the south of the Tut District center, with the district located to the north between the regulator and the powerhouse.
The structures included in the project consist of the following components:
| Design Discharge | 50.00 m3/s |
|---|---|
| Number of Units | 3 units |
| Installed Capacity | 30.10 MW |
| Gross Head | 70.84 m |
| Total Energy | 137.60 GWh/year |
| Regulator Height | 7.00 m |
| Crest Length | 75.00 m |
| Transmission Channel Type | Trapezoidal Channel |
| Transmission Channel Length | 12,120.00 m |
| Penstock Diameter | 3.60 m |
| Penstock Length | 105.00 m |